Proposed: Hydraulic Road and U.S. 29 Transportation Improvements
VDOT proposes to construct multiple transportation improvements to improve safety and efficient movement as well as increase multi-modal access within the Hydraulic Road and U.S. 29 area.
Through this design-build project, VDOT proposes to
- construct a pedestrian bridge over U.S. 29 with bus stops and shelters near Zan Road
 - construct a signalized pedestrian crossing and reconfigured traffic movements at the Hydraulic Road and U.S. 29 intersection
 - reconstruct the Hillsdale and Hydraulic Road intersection as a roundabout
 - improve access management at the Hydraulic Road/Brandywine Drive and Hydraulic Road/Michie Drive intersections
 
This project is fully funded through the SMART SCALE process.
Project update: Since the public hearing was held in May 2022 the reconstruction of the U.S. 29-Angus Road intersection into a Continuous Green-T configuration has been removed from the proposed improvements.
Benefits
The proposed improvements will improve safety and traffic flow, and enhance mobility for pedestrians.
Resources
Other relevant links:
Public Hearing Brochure 
 (6.6 MB)
Public Hearing Comment Sheet 
 ( 280 KB)
Public Hearing Display 1 
 (2.6 MB)
Public Hearing Display 3 
 (1 MB)
Public Hearing Display 4 
 (3.1 MB)
Public Hearing Display 5 
 (1.9 MB)
Public hearing advertisement 
 (43 KB)
FHWA Roundabout information 
  (619 KB)
Major funding source: SMART SCALE
Phase: Proposed
UPC: 118880
State ID: 0029-M03-371, P101, R201, C501
                Lat/Long: 38.06202282134502, -78.49158046340267
                
              
              
                
                
                Locality:
                
                Albemarle
                
                
        and
       
                
                
                Charlottesville
                
                
                
                
            



            
						