Recently Completed: Louisa - Roundabout at Broad Street Road and Cross County Road

Cost and schedule ►


Traffic alerts ►

Traffic Impacts Complete

The intersection was converted to a single-lane roundabout in Spring 2022. Major traffic impacts are now complete, but drivers should remain aware at the intersection and follow guiding signage when applicable as crews complete final improvements. 

Construction will be complete by late fall 2022. 

Project Details

The primary purpose of this project is to replace the existing two-way stop controlled intersection of Route 250 (Broad Street Road) and Route 522 (Cross County Road) with a single-lane roundabout. 

Benefits 

A roundabout has been chosen to improve the safety and efficiency of the intersection.

Roundabouts are safer than traffic signals and conventional stop-controlled intersections because traffic can continually and efficiently flow through the intersection and vehicle operating speeds are lower. Additionally, roundabouts help reduce air pollution and fuel use compared to a signalized intersection due to reduced idling and less acceleration and deceleration. 

Major Milestones 

Public Information Meeting: February 28, 2017

Design Public Hearing: July 24, 2018

Public comment ends: August 3, 2018

Right of way acquisition: Winter 2018

Begin construction: September 10, 2021

Construction complete: December 23, 2022

Resources

Other relevant links:

Federal Highway Administration: Roundabouts

Roundabouts in Virginia

Previous Meetings >>

Phase: Under Construction

UPC: 107081

State ID: 0250-037-S63, P101, R201, C501

Lat/Long: 37.775515, -77.896890

Locality: Louisa

Page last modified: Nov. 11, 2023