Recently Completed: U.S. 29-Vint Hill Rd. Intersection Improvements

Cost and schedule ►


Traffic alerts ►

Construction of dual left-turn lanes at the intersection of U.S. 15/29 (Lee Highway) and Route 215 (Vint Hill Road) in Fauquier County. The project will require widening Route 215 in the vicinity of the intersection to receive and merge traffic.

Preliminary project design plans

Aerial rendering of proposed improvements

Benefits 

The project will improve safety and operations at the intersection. In addition to the dual left-turn lanes, construction will include traffic signal upgrades and necessary storm water management measures.

Major Milestones 

Construction contract awarded November 2022. 

Resources

Contact Info:

Robert Lewis, Senior Inspector
(540) 717-1435

Joshua Hayes, Senior Inspector
(540) 533-5182

Other relevant links:

Willingness to Hold Public Hearing Advertisement, Fauquier Times, November 11 & 18, 2020

National Environmental Policy Act Programmatic Categorical Exclusion, October 21, 2020

No Adverse Effects Determination, Va. Department of Historic Resources, October 8, 2020

Several surveys of environmental and cultural resources in the Buckland area were done as part of previous VDOT projects. 

Cultural Resources Investigation for Route 215 Project (draft final report), January 30, 2008

Archaeological Survey for Replacement of Route 15/29 Bridge over Broad Run, July 2007

Archaeological Evaluation of Sites on Route 215 at Buckland, April 2006

Archaeological Site Identification Study of Route 215, April 2002

Previous Meetings >>

Major funding source: Highway Safety Improvement Program

Phase: Under Construction

UPC: 111728

State ID: 0029-030-829, C501, P101, R201

Lat/Long: 38.777500, -77.681993

Locality: Fauquier

Page last modified: Oct. 25, 2023