Route 1 Corridor Study, City of Fredericksburg (STARS Program)

Project at a Glance
Phase
Study

Locality
Fredericksburg

District
Fredericksburg

Contact
Stephen Haynes, VDOT Fredericksburg District Planning Manager
(540) 899-4709
Kelly Hannon, VDOT Communications Manager
(540) 374-3344

About the Study

The Virginia Department of Transportation, in partnership with the City of Fredericksburg, conducted a study to develop recommendations to improve the efficiency and safety of the Route 1 corridor from the Falmouth Bridge to Route 3.

Final Study Report

Proposed improvements for multiple locations on Route 1 have been developed as part of a study of the corridor. The study is being funded as part of VDOT's Strategically Targeted Affordable Roadway Solutions (STARS) program.

Recommendations have been developed to improve intersections on Route 1 in Fredericksburg at four locations:

• Route 1 and Princess Anne Street

• Route 1 and Fall Hill Avenue

• Route 1 and Augustine Avenue and Powhatan Street

• Multiple intersections on Route 1 between Route 3 interchange and Cowan Boulevard

Public Meeting: Monday, August 27, 2018

VDOT and the City of Fredericksburg held a public meeting in August 2018 at James Monroe High School to share the study's draft recommendations. 

Meeting presentation

Comment sheet

Meeting displays