Coming Soon: Monroe Bay Circle Culvert Replacement Project
Cost and schedule ►
The proposed project will replace five deteroriated metal pipes under Route 658 (Monroe Bay Circle) over Monroe Creek in Westmoreland County with a concrete double box culvert.
The project will remove the pipes, install the double box culvert and replace the roadway on Monroe Bay Circle. During construction, crews will close Monroe Bay Circle to traffic between Wakefield Drive and Stoney Knoll.
The proposed detour route would be Route 1300 (Shore Drive), Route 1308 (Rolando Drive), Route 633 (Holly Vista Drive) and Route 628 (Stoney Knoll) for at least 8 months for the culvert replacement project.
Notice of Willingness Newspaper Advertisement
Benefits
The project will remove the corrugated metal pipes, install the concrete double box culvert and replace the roadway on Monroe Bay Circle to improve drainage and travel in the area.
Resources
Ms. Jessica Graves
(540) 899-4267
Major funding source: State of Good Repair Bridge
Phase: Proposed
UPC: 121539
State ID: 0658-096-631
Lat/Long: 38.231227, -76.986856
Locality:
Westmoreland