Recently Completed: Route 207 Southbound Bridge Replacement over Mattaponi River

The project replaced the Route 207 southbound bridge over the Mattaponi River in Caroline County.

Benefits 

The existing bridge was built in 1957 and is structurally deficient. Structurally deficient does not mean a bridge is unsafe for travel, but it is an indicator that a bridge needs maintenance or repair work to improve its condition. 

The project replaced the existing structure with a new concrete bridge on steel beams. 

Major Milestones 

March 2020: Construction begins, and 45 mph temporary work zone speed limit is posted

May 2020: Route 207 southbound bridge closes to traffic, and Route 207 is reduced to one lane in each direction with all traffic crossing the northbound Mattaponi River bridge

September 2021: New bridge opens, and all construction is complete

Resources

Major funding source: State of Good Repair

Phase: Under Construction

UPC: 110111

State ID: 0207-016-634

Lat/Long: 38.026733,-77.390535

Locality: Caroline