Recently Completed: Route 743 over South River Bridge Replacement
Cost and schedule ►
Traffic alerts ►
Public outreach ►
The project will replace the existing structurally deficient timber bridge.
The new bridge will have a concrete deck and beams that will allow heavier vehicles to cross the structure.
The bridge is currently posted at 10 tons.
The new bridge will be built next to the existing bridge.
Drivers will continue to use the existing structure until the new bridge is complete and open to traffic.
Benefits
To replace the structurally deficient timber bridge originally built in 1959.
The new bridge will have a concrete deck and beams and will be able to accommodate heavier vehicles.
There will be no weight restriction on the new bridge.
Resources
Major funding source: State of Good Repair Program
Phase: Under Construction
UPC: 111392
State ID: 0743-016-638, P101, R201, M501, B64
Lat/Long: 38.110068 -77.360753
Locality:
Caroline