In Design: Air Terminal Interchange (ATI) Eastern Intersection
Cost and schedule ►
Public outreach ►
This project is located in Norfolk and includes improvements to the Interstate 564 (I-564) Intermodal Connector highway that connects I-564 to Hampton Boulevard.
The purpose of this eastern intersection project is to support Naval operations, facilities and emergency readiness by designing and constructing a new intersection within the eastern side of the I-564 Intermodal Connector. The eastern intersection will create a new interchange connecting the Naval Station’s residences and facilities in the Camp Allen area directly to the I-564 Intermodal Connector for improved access to I-564 and Hampton Boulevard. The proposed plans for the eastern intersection also include the construction of a bridge spanning the railway and the I-564 Intermodal Connector’s eastbound lanes.
Benefits
The new eastern intersection will include the following:
- Contruction of new bi-directional access road from nearby Camp Allen area to the Intermodal Connector. Vehicles will be able to enter the Intermodal Connector directly from the Naval Station's residences and facilities in the Camp Allen area.
- Addition of a full interchange at the northern connection point with the Intermodal Connector to allow vehicles traveling from Camp Allen faster and easier access to points east or westbound on the Intermodal Connector.
- Construction of a new bride spanning the railway and the Intermodal Connector's eastbound lanes.
Major Milestones
October 2023: A combined Location and Design Public Hearing and comment period to gather public input on preliminary design, will be held at Sewells Point Elementary School on October 4, 2023 from 4-7 p.m. to discuss the project. Comments are accepted at or after the event until October 14, 2023.
Digital copies of the project boards shared at the public hearing are below in PDF format.
Project Brochure
Welcome Display
Project Benefits and Estimated Costs
Bridge Section Overview
Bridge Typical Sections
Typical Sections at Intermodal Connector
Typical Sections at Ingersol Avenue
Project Estimated Schedule
Project Map
Project Map showing both eastern and western intersection projects on Intermodal Connector
Send comments to Mr. Frank Fabian, P.E., PMP, Project Manager, Virginia Department of Transportation, 7511 Burbage Drive, Suffolk, VA 23435. You may also e-mail your comments to Frank.Fabian@VDOT.Virginia.gov. Please reference “Air Terminal Interchange Eastern Intersection Project Comment” in the subject line. Read here for full details for the public hearing.
Resources
Hampton Roads Communications
757-956-3032
Phase: In Design
UPC: 123154
Lat/Long: 36.933609, -76.301976
Locality:
Norfolk