About the Study

VDOT conducted a corridor evaluation study (similar to past major investment studies) that included collection of existing traffic data, current and future operations analysis, access management, and identification of current interstate deficiencies, to evaluate the need for additional interchanges and upgrades in the future.

View the Final Report

Table of Contents

Chapter 1: Introduction

Chapter 2: Mainline Freeway Analysis

Chapter 3: Military Highway Interchange

Chapter 4: I-64/I-264 Interchange

Chapter 5: Newtown Road Interchange

Chapter 6: Witchduck Road Interchange

Chapter 7: Independence Boulevard Interchange

Chapter 8: Rosemont Road Interchange

Chapter 9: Lynnhaven Parkway Interchange

Chapter 10: Laskin Road Interchange

Chapter 11: First Colonial Road Interchange

Chapter 12: Birdneck Road Interchange

Chapter 13: I-264 & Parks Avenue

Chapter 14: Findings and Conclusions

Appendix A - Existing Conditions Geometry

Appendix B - Flood Zones:

Appendix C - Land Use

Appendix D - Forecast Model Methodology and Balancing

Appendix E - Graphical Volume Figures - No Build

Appendix F - Graphical Volume Figures - Build

Appendix G - CORSIM Graphical Outputs

Appendix H - Managed Lanes

Appendix I - Detailed Cost Estimates

Appendix J - Traffic Counts:

Appendix N - Traffic Count Locations:

Appendix O - Design Notes