Studies: Timberlake Road Corridor Improvement Study
Cost and schedule ►
This study evaluated the existing and projected future conditions on Timberlake Road between Waterlick Road and Leesville Road; identified deficiencies in the road network; forumlated alternatives and corrective measures; computer planning level cost estimates; and prioritized recommended improvements along Timberlake Road.
Benefits
Identify the extent of the operational and safety challenges on the corridor. Develop potential transportation solutions.
Resources
Rick Youngblood
434-856-8331
Other relevant links:
Phase: Study
Lat/Long: 37.347859, -79.232638
Locality:
Lynchburg