Under Construction: 21st Street North over I-66 Bridge Rehabilitation in Arlington County
Cost and schedule ►
Traffic alerts ►
Public outreach ►
Please note: Construction began in July 2023.
Work is underway on the 21st St N bridge over I-66 just east of Spout Run Pkwy in #Arlington! The bridge rehabilitation project, which includes resurfacing the concrete deck and repairing piers, is scheduled for completion in late 2024.
— VDOT Northern VA (@VaDOTNOVA) July 28, 2023
Read more here: https://t.co/YI7edw43XU pic.twitter.com/9XcQRvcZSN
This project is rehabilitating the 21st Street North bridge over I-66 located between the Spout Run Parkway (Exit 72) and eastbound I-66 Route 29 Rosslyn/Key Bridge (Exit 73) interchanges. The bridge was built in 1980.
The project includes:
- Resurfacing the concrete bridge deck
- Closing deck joints
- Repairing concrete piers and abutments
- Replacing bearings
The width of the existing lanes and sidewalks on the bridge will remain the same.
During construction:
- Daytime lane closures may be scheduled along I-66 and 21st Street North
- Overnight lane closures may be scheduled on I-66
- When one sidewalk along the bridge is closed, pedestrians will be detoured to the sidewalk on the opposite side
- The Custis Trail under the bridge will remain open to bicyclists and pedestrians
- Parking will not be allowed on the bridge or approaches
Starting in mid-2024, 21st Street North will be temporarily reduced to one lane on the bridge and open to northbound traffic only. Further information will be provided closer to the start of the partial bridge closure, which will be in place for several months while work occurs on the bridge deck.
Estimated Costs
Preliminary Engineering - $755,000
Construction - $3.3 million
Total - $4.1 million
This project is financed with federal and state funding, including State of Good Repair funds used for bridges.
Benefits
This project will improve safety for drivers and pedestrians and extend the overall life of the bridge.
Major Milestones
Virtual Public Information Meeting - June 2022
Advertise for Construction - March 2023
Award Construction Contract - May 2023
Begin Construction - July 2023
Begin 21st Street Southbound Temporary Closure and Detour - Mid-2024
Final Completion - Late 2024
Resources
Donald Angerman, CCM
Construction
703-259-3253
Yusaf Masud, P.E.
Construction
703-259-2973
Other relevant links:
Construction Underway News Release - July 2023
Virtual Public Information Meeting Video, English Presentation, Simplified Chinese Presentation, Spanish Presentation, Comment Sheet, News Release, Ad and Meeting Details -
June 2022
Programmatic Categorical Exclusion -
April 2022
Major funding source: State of Good Repair
Phase: Under Construction
UPC: 118788
State ID: 0066-000-912, B625, P101
Federal ID: STP-5B01 (207), NHPP-5B01 (339)
Lat/Long: 38.897568, -77.085199
Locality:
Arlington