In Design: North Old Glebe Road over North Glebe Road Bridge Replacement in Arlington County

Cost and schedule ►

Public outreach ►

This project will replace the North Old Glebe Road bridge over North Glebe Road (Route 120). The bridge, which averages 7,000 vehicles a day, was built in 1964.

A new bridge will be constructed due to the estimated rehabilitation cost of the existing bridge exceeding 65% of the estimated cost to replace the bridge.

The new bridge will feature a wider sidewalk on the eastern side and an additional sidewalk on the western side.

Estimated Project Costs

Preliminary Engineering - $1.5 million
Construction - $13.5 million

Total - $15 million

The project is financed with federal and state funding, including State of Good Repair funds used for bridges.

Benefits 

This project will:

  • Improve driver and pedestrian safety
  • Maintain driver mobility 
  • Enhance pedestrian mobility via the additional sidewalk
  • Reduce maintenance costs

Major Milestones 

Virtual Public Information Meeting - October 2023
Design Public Hearing - Late 2024
Advertise for Construction - Early 2027
Begin Construction - Mid-2027

Resources

Contact Info:


Dipali Patel, P.E.
Structure & Bridge
703-259-2429

Minwoo Ha, P.E.
Preliminary Engineering
703-259-2207

Other relevant links:

Virtual Public Information Meeting -
October 2023

Major funding source: State of Good Repair

Phase: In Design

UPC: 119204

State ID: 6743-000-914, B610, P101, R201

Federal ID: NHPP-5B01 (257)

Lat/Long: 38.925936, -77.122202

Locality: Arlington

Page last modified: Nov. 9, 2023