In Design: Route 7 and Route 9 Eastbound Ramp Extension in Loudoun County

Cost and schedule ►

Public outreach ►

The project will extend the acceleration lane from Route 9 onto eastbound Route 7 in Loudoun County to make it easier for drivers to merge into traffic from the ramp.

This improvement is part of the Strategically Targeted Affordable Roadway Solutions (STARS) Route 7 Corridor Improvement Study completed in December 2017.

Estimated Costs
Preliminary Engineering: $610,000
Right of Way: $44,000
Construction: $2.3 million
Total: $2.7 million

The project is financed with federal and state funding.

Benefits 

This project aims to improve safety and relieve congestion.

Major Milestones 

Environmental Documentation (Programmatic Categorical Exclusion) Available September 2022
Issue Notice of Willingness to Hold a Public Hearing- October
 2022

Begin Right of Way Acquisition - Winter 2023/24 
Begin Construction - Winter 2024/25 

Resources

Contact Info:

W. Calvin Britt, P.E.
Location & Design
703-259-2961

Kimberly McCool, P.E.
Preliminary Engineering
703-259-3220

Major funding source: Federal

Phase: In Design

UPC: 114103

State ID: 6007-053-198, P101

Federal ID: NCBP-5A01 (973)

Lat/Long: 39.14104,-77.6109313

Locality: Loudoun

Page last modified: Nov. 9, 2023