Project at a Glance
Begin Date
July 2015

Est Completion Date
January 2020

Phase
Study

Cost
$1.6 million

Lengths and Limits
Shirlington interchange to Glebe Rd

Locality
Alexandria and Arlington

District
Northern Virginia

Contact
Andrew Beacher, P.E.
Preliminary Engineering
703-259-2239

About the Study

This study assessed safety and operational improvements at the I-395 Shirlington interchange (Exit 6), as well as at the following:

  • Ramp from South Glebe Road (Route 120) to southbound I-395
  • Intersection of South Shirlington Road and South Arlington Mill Drive
  • Intersection of Gunston Road and Martha Custis Drive

The study collected data on traffic volumes and vehicle movements, and identified safety and operational issues. Alternatives were identified, which aim to reduce congestion, crashes, and boost the interchange's overall performance.

The study was financed with federal funds.

A detailed analysis of selected alternatives occurred in summer 2018. The final report detailing the preferred alternative was issued in January 2020.

Schedule
Begin Study - July 2015
First Public Information Meeting - May 2018
Second Public Information Meeting - June 2019
Final Report - January 2020

Resources

Final Report - January 2020

Final Report and Appendices A-E, F and G-J

Second Public Information Meeting - June 2019 (Ad)

Meeting Materials and Displays

First Public Information Meeting - May 2018 (Ad)

Public Comment Summary

Meeting Materials and Displays

Project Numbers
State: 0395-100-842, P101
UPC: 107831
Federal: OC-395-4 (187)