I-395 Shirlington Interchange Improvements Study
Safety and operational enhancements in the City of Alexandria and Arlington County
About the Study
This study assessed safety and operational improvements at the I-395 Shirlington interchange (Exit 6), as well as at the following:
- Ramp from South Glebe Road (Route 120) to southbound I-395
- Intersection of South Shirlington Road and South Arlington Mill Drive
- Intersection of Gunston Road and Martha Custis Drive
The study collected data on traffic volumes and vehicle movements, and identified safety and operational issues. Alternatives were identified, which aim to reduce congestion, crashes, and boost the interchange's overall performance.
The study was financed with federal funds.
A detailed analysis of selected alternatives occurred in summer 2018. The final report detailing the preferred alternative was issued in January 2020.
Schedule
Begin Study - July 2015
First Public Information Meeting - May 2018
Second Public Information Meeting - June 2019
Final Report - January 2020
Resources
Final Report - January 2020
Final Report and Appendices A-E, F and G-J
Second Public Information Meeting - June 2019 (Ad)
Meeting Materials and Displays
First Public Information Meeting - May 2018 (Ad)
Meeting Materials and Displays
Project Numbers
State: 0395-100-842, P101
UPC: 107831
Federal: OC-395-4 (187)