Recently Completed: Richmond - Intersection Improvements at I-195 and Laburnum Avenue
Cost and schedule ►
Public outreach ►
Some of the major improvements completed during this project are:
- Replace the existing intersection of Laburnum Avenue and Interstate 195 south with a roundabout.
- Construct a separate left turn lane at Interstate 195 north and Laburnum Avenue.
- Improve beautification of the intersection by installing landscaping.
Benefits
The primary purpose of this project is to improve traffic flow through the area during peak travel times, eliminate prolonged periods of delay and improve safety within the project limits.
Resources
Brian Ramsey
(804) 585-3579
Phase: Complete
UPC: 109311
State ID: U000-127-969, P101, R201, C501
Federal ID: NHPP-5A27(674)
Lat/Long: 37.583838, -77.474299
Locality:
Richmond