In Design: Richmond Mayo's Bridge Superstructure Replacement

Cost and schedule ►

Public outreach ►

The purpose is to replace the existing Mayo's Bridge superstructure. VDOT is currently evaluating the existing piers to determine replacement options. 

Benefits 

Proposed improvements will extend the life of Mayo's Bridge.

Resources

Contact Info:

William Wheeler, Project Manager
804-609-5280

Other relevant links:

Super and Sub-Structure Diagram

Phase: In Design

UPC: 104888

State ID: U000-127-860

Federal ID: RSTP-5A27(564)

Lat/Long: 37.530911478758625, -77.43348956647425

Locality: Richmond

Page last modified: Aug. 7, 2023