Public Hearing on the Draft Environmental Impact Statement (September 1, 2020)

This public hearing, rescheduled from March 26, 2020, provided an opportunity for the public to discuss the Martinsville Southern Connector Study: Route 220 Draft Environmental Impact Statement (EIS).

Information Brochure

Information Brochure (en español)

Display Boards

Detailed Maps of the Alternatives Evaluated in the Draft EIS

New - Modifications to the Preferred Alternative (click to view)

Draft EIS Alternatives and Modified Preferred Alternative (Aerial Maps)

___________________________

Commonwealth Transportation Board Briefing #3
The Commonwealth Tranportation Board (CTB) was briefed on VDOT's staff recommendation for a preferred alternative for the Martinsville Southern Connector Study on December 10, 2019. 

December 2019 Presentation to CTB

___________________________

Location Public Hearing (August 15, 2019)
A location public hearing was held on August 15, 2019 at Drewry Mason Elementary.

The meeting purpose was to solicit public input on VDOT's recommended preferred alternative.

Presentation

Information Brochure

Information Brochure (en español)

Display Boards

Detailed Maps of the Alternatives Considered

Comment Form

This public comment period closed on August 25, 2019.

___________________________

Commonwealth Transportation Board Briefing #2
CTB was briefed on updates to the study, including the range of alternatives, on May 14, 2019.

May 2019 Presentation to CTB

___________________________

Commonwealth Transportation Board Briefing #1
CTB was introduced to the study, and was presented with the Purpose and Need and background information regarding the study schedule.

February 2019 Presentation to CTB

___________________________

Citizen Information Meeting #2
A citizen information meeting was held January 23, 2019 at Drewry Mason Elementary from 6-8:00 p.m.

The meeting introduced the Purpose and Need Statement (which sets the goals for the study) and the alignment options under consideration.

The public comment period on these materials closed on February 2, 2019

___________________________

Citizen Information Meeting #1
A citizen information meeting was held May 8, 2018, to introduce the Martinsville Southern Connector Study, gather public comments on transportation issues along the U.S. Route 220 corridor and solicit input on social, economic, and natural environmental resources that may need to be considered as part of the study.


The public comment period closed on May 18, 2018