RELEASE:

CONTACT:
IMMEDIATE

Darragh Frye 540-899-4119
Darragh.Frye@VDOT.Virginia.Gov

FRED-203004

May 3, 2023



MAJOR TRAFFIC SHIFT ON LADYSMITH ROAD IN CAROLINE COUNTY SET FOR WEDNESDAY, MAY 17
Traffic will be shifted to the new road alignment as work advances to widen the two-lane road to four lanes from I-95 to Route 1

Tuesday, May 16 UPDATE: The major traffic shift on Ladysmith Road in Caroline County set for tomorrow, May 17 has been postponed. The existing traffic pattern will remain in place until a new date is available. Work will continue to widen the two-lane road to four lanes from I-95 to Route 1. Crews need to shift traffic to the new road alignment to build the future travel lanes.  An additional traffic alert will be sent with a new date once its announced from the contractor.

FREDERICKSBURG, Va. As work advances to widen Route 639 (Ladysmith Road) in Caroline County to four lanes from Interstate 95 to Route 1, crews will need to shift traffic to the new road alignment to build the future travel lanes.   

The traffic shift is scheduled to occur on Wednesday, May 17. 

Ladysmith Road will remain two travel lanes, one eastbound and one westbound, in the work zone until construction is complete in spring 2024. 

All westbound traffic on Ladysmith Road between Route 712 (Green Road) and Center Drive will be shifted to the future eastbound lanes. All eastbound traffic between Route 692 (Allen Street) and Route 712 (Green Road) will be shifted to the new road alignment. 

A new raised median is also being built to separate eastbound and westbound travel lanes to improve mobility through the corridor. 

Message boards will be posted to give drivers advance notice to the major traffic shift later this month. 

When construction is complete on the $26.4 million project, Ladysmith Road will have four travel lanes nearly a mile in distance, a 10-foot wide, paved shared-use path for pedestrians and bicyclists, a 5-foot-wide sidewalk at the intersection, crosswalks and new traffic signal equipment will be installed for pedestrian crossings.

Project Background 

The project is a partnership between Caroline County and the Virginia Department of Transportation (VDOT).

Caroline County submitted an application to assist in funding this project through Virginia’s SMART SCALE program. Additional funding is being provided through VDOT’s revenue-sharing program, which matches county funds with state transportation dollars.

The project seeks to reduce current and future congestion in the Ladysmith area by providing more capacity for travelers, and to promote economic development at this gateway entrance to the Caroline community.

Widening Ladysmith Road will create room for dual left turn lanes for eastbound and westbound traffic at the Route 1 intersection to reduce delays for drivers. Dedicated right turn lanes will also be built for Ladysmith Road traffic approaching Route 1.

Motorists should be alert for construction crews and slow-moving equipment operating in the work zone on Route 1 and Ladysmith Road until May 2024.

Around 11,000 vehicles a day travel on Ladysmith Road in the project corridor, according to a 2021 VDOT traffic count.

511Virginia

Motorists can find real-time information on lane closures, work zones, traffic and other incidents on 511Virginia

Download the free mobile 511Virginia app for Apple and Android devices to stay connected, or visit http://www.511virginia.org/.  Motorists also can reach 511Virginia by calling 511 when they are not operating a motor vehicle or while using a hands-free device. 

Do not use a handheld cell phone or mobile device while driving (it’s the law). 

Follow VDOT Fredericksburg District on Twitter @VaDOTFRED.



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.
Page last modified: May 16, 2023