VDOT News - Hampton Roads
RELEASE: CONTACT: |
IMMEDIATE Hampton Roads Public Affairs 757-956-3032 HamptonRoadsPublicInfo@VDOT.Virginia.gov |
HRO-205119 Aug. 18, 2023 |
HAMPTON ROADS WEEKLY LANE CLOSURES REPORT AUGUST 20-26
Closures on Water Crossings, Interstates, and Other Notable Detours
NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
*Scheduled closures are subject to change based on weather conditions and other factors.*
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.
Bridges and Tunnels:
Hampton Roads Bridge-Tunnel, I-64:
- Single-lane closure eastbound Aug. 21 from 9 p.m. to 5 a.m.
- Single-lane closure westbound Aug. 23 from 9 p.m. to 5 a.m.
- Mobile, single-lane closures westbound Aug. 24 from 9 p.m. to 5 a.m.
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
- Alternating, mobile, single-lane closures northbound Aug. 22 from 9 a.m. to 2 p.m.
High Rise Bridge, I-64:
- Brief, intermittent stoppages on I-64 east Aug. 21 from 11 p.m. to 5 a.m.
Berkley Bridge, I-264:
- Brief, intermittent stoppages on I-264 from 9 p.m. to 1 a.m.
- Eastbound: Aug. 21
- Westbound: Aug. 22
- Full closure of the off-ramp from I-264 east to I-464 south Aug. 23 from 10 p.m. to 5 a.m.
- Full closure of I-264 east at Tidewater Drive (exit 10) Aug. 22 from 10 p.m. to 5 a.m.
- Double-lane closure on I-264 east Aug. 23-24 from 8 p.m. to 5 a.m.
James River Bridge, Route 17:
- Single-lane closures southbound Aug. 21-25 from 9 a.m. to 3 p.m.
George P. Coleman Bridge, Route 17:
- Alternating, single-lane closures in both directions Aug. 21-25 from 9 a.m. to 3 p.m.
HRBT Expansion Project:
- For lane closures and project updates related to the HRBT Expansion Project, visit org.
Elizabeth River Tunnels (Downtown/Midtown Tunnels):
- Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
I-64, Southside Widening, High Rise Bridge Expansion:
- For additional information about lane closures and other project impacts, click here: http://64highrise.org/news_and_traffic_alerts/lane_closures.asp.
I-64, Hampton Roads Express Lanes:
For additional information about Hampton Roads Express Lanes closures and traffic impacts, visit https://64expresslanes.org/traffic_alerts/traffic_alerts.asp.
Hampton:
- Full close of the on-ramp from Settlers Landing Road/Woodland Road to I-64 west Aug. 20 from 9 p.m. to 5 a.m.
- Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert here.
Norfolk, Reversible Roadway:
- Full closure in both directions:
- Aug 21 from 9:30 a.m. to 12:30 p.m.
- Aug. 22 from 8 p.m. to 3 a.m.
(END)
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.