VDOT News - Hampton Roads

RELEASE:

CONTACT:
IMMEDIATE

Hampton Roads Public Information 757-956-3032
HamptonRoadsPublicInfo@VDOT.Virginia.gov

HRO-206603

Nov. 22, 2023



HAMPTON ROADS WEEKLY LANE CLOSURES REPORT NOV. 26 TO DEC. 2
Closures on Water Crossings, Interstates, and Other Notable Detours

** VDOT will suspend most highway work zones and lift lane closures on interstates and other major roads in Virginia for Thanksgiving travel beginning noon, Wednesday, Nov. 22, until noon, Monday, Nov. 27. Read the statewide holiday travel release here** 
NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
*Scheduled closures are subject to change based on weather conditions and other factors.*
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Bridges and Tunnels:

Hampton Roads Bridge-Tunnel, I-64:

  • Single-lane closures from 9 p.m. to 5 a.m.:
    • Eastbound Nov. 27 and Nov. 30
    • Westbound Nov. 28-29


Monitor-Merrimac Memorial Bridge-Tunnel, I-664:

  • Alternating, single-lane closures northbound Nov. 27-30 from 9 p.m. to 5 a.m.


Berkley Bridge, I-264:

  • Alternating, mobile, single-lane closures westbound Nov. 27 from 7 p.m. to 5 a.m.
  • Double-lane closures westbound Nov. 27-30 from as early as 7 p.m. to 5 a.m.
  • Double-lane closures westbound Dec. 1-2 from 8 p.m. to 6 a.m.

James River Bridge, Route 17:

  • Brief, intermittent stoppages in both directions Nov. 27 to Dec. 1 from 9 a.m. to 3 p.m.
  • Single-lane closures in both directions Nov. 28-29 from 9 a.m. to 3 p.m.


HRBT Expansion Project:

  • For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

  • Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:

Hampton:

  • Full closure of the off-ramp from I-64 west to Armistead Avenue/LaSalle Avenue exit 265B) Nov. 27-30 from 10 p.m. to 5 a.m. View the full traffic alert here.
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert here.

Norfolk:

  • Brief, intermittent stoppages on the off-ramp from I-564 east to Little Creek Road Nov. 27-29 from 7 p.m. to 3 p.m.


Norfolk, Reversible Roadway:

  • Full closure in both directions:
    • Nov. 27-30 from 8 p.m. to 3 a.m.
    • Nov. 30 from 9:30 a.m. to 12:30 p.m.
    • from 12:01 a.m. Dec. 2 until 12:01 a.m. Dec. 3

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Nov. 22, 2023