VDOT News - Lynchburg

RELEASE:

CONTACT:
IMMEDIATE

Len Stevens 434-856-8176
len.stevens@vdot.virginia.gov

LYN-205911

Sept. 29, 2023



UPDATE: CHANGE IN TRAFFIC PATTERN - ROUTE 15/360 IN CHARLOTTE COUNTY
Due to Construction Activity, beginning October 2

Image showing traffic pattern change on Route 15 at Route 360 in Charlotte County beginning Monday, Oct. 2, 2023

Traffic pattern change on Route 15 at Route 360 in Charlotte County beginning Monday, Oct. 2, 2023

LYNCHBURG, Va. – VDOT will be modifying the intersection of Route 15/360 Business (Four Locust Highway) at the intersection of Route 15 (Farmville Highway) beginning October 2nd, due to construction activity.

The intersection will be reconfigured with southbound Route 15 (Farmville Highway) traffic coming to a stop at the intersection, with two-way traffic movement along Route 15/360 Business (Four Locust Highway).The on-ramps to Southbound Route 15/360 (Kings Highway) and the off-ramp from Southbound Route 15/360 (Kings Highway) to Route 15 (Farmville Highway) will be closed to traffic.

Drivers that use these ramps will be detoured as shown in the attached map. Detour signage will alert motorists to the change and direct traffic along the detour. Please use extra care when driving in the area. All work is weather pending. This traffic configuration will be in place until approximately Summer 2024.



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Sept. 29, 2023