VDOT News - Northern Virginia

RELEASE:

CONTACT:
IMMEDIATE

Ellen Kamilakis
ellen.kamilakis@vdot.virginia.gov

NR20-032

April 13, 2020



Reid Lane Closure in Nokesville April 14-16
Detour in place during stormwater pipe work


Update: Reid Lane reopened to traffic Wednesday, April 15.


NOKESVILLE
– Reid Lane (Route 657) between Fauquier Drive (Route 605) and Fitzwater Drive (Route 652) will be closed to through traffic (weather permitting) from 8 a.m. Tuesday, April 14 to 3:30 p.m. Thursday, April 16 to replace a stormwater pipe, according to the Virginia Department of Transportation.

Those needing to reach properties along Reid Lane will have access; however, traffic will not be able to go beyond the point of pipe replacement in either direction.

Through traffic will be detoured via Fauquier Drive, Route 28 (Nokesville Road) and Fitzwater Drive back to Reid Lane. 

Follow VDOT Northern Virginia on Twitter: @vadotnova

END



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Aug. 29, 2023