VDOT News - Northern Virginia

RELEASE:

CONTACT:
IMMEDIATE

Michael Murphy
michael.murphy@vdot.virginia.gov

NR23-095

Nov. 30, 2023



I-395 Southbound/Boundary Channel Drive Eastbound Ramp Closures in Arlington Begin Morning of Dec. 1
I-395 Exit 9 (Clark St) ramp and eastbound Boundary Channel ramp to southbound I-395 closing permanently

ARLINGTON – Beginning at 5 a.m. Friday, Dec. 1, weather permitting, the ramp from southbound I-395 to eastbound Boundary Channel Drive (Exit 9/Clark Street) and the eastbound Boundary Channel Drive ramp to southbound I-395 will close permanently as part of the Boundary Channel Drive at I-395 Interchange Improvements project, according to the Virginia Department of Transportation.

In addition, the following traffic patterns will be in effect with the full opening of the western roundabout at 5 a.m. Friday:

  • Southbound I-395 drivers will use the Exit 10A ramp to access both westbound and eastbound Boundary Channel Drive via the roundabout
  • Eastbound Boundary Channel Drive drivers will use the roundabout to access southbound I-395 via the same loop ramp currently used by westbound Boundary Channel Drive drivers to access southbound I-395

The Boundary Channel Drive at I-395 Interchange Improvements project will improve safety and traffic flow and provide new options for bicyclists and pedestrians in one of the region’s busiest corridors. The project includes reducing underutilized roadway capacity on Boundary Channel Drive in order to construct a 12-foot-wide westbound shared-use path and an eight-foot-wide eastbound sidewalk. The half-mile shared-use path will create a new link from the Mount Vernon Trail to the Pentagon and Long Bridge Park by tying into the existing path that parallels the southbound George Washington Memorial Parkway ramp to southbound I-395. Other project improvements include installing roundabouts on Boundary Channel Drive just east and west of I-395, reconfiguring the ramps between I-395, Boundary Channel Drive and Long Bridge Drive, and adding crosswalks along Boundary Channel Drive and Long Bridge Drive. The project is scheduled for completion in early 2024.

Drivers, bicyclists and pedestrians are reminded to use caution when traveling in active work zones. Be alert to new traffic patterns and limit distractions.  

You can get real-time traffic, work zone and incident information online at 511virginia.org, via the free mobile 511Virginia app, or by calling 511 in Virginia anywhere anytime.

Follow VDOT Northern Virginia on Twitter: @vadotnova

END



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Nov. 30, 2023