Studies
Interstate 64 Hampton Roads Bridge-Tunnel Study (Corridor from I-664 in Hampton to I-564 in Norfolk)
Facilities-Hampton/Norfolk
Study Updates
VDOT and FHWA released the Draft EIS on December 21, 2012 for public review. All comments were due by February 13, 2012.
A full copy of the Draft EIS is available for download on this website.
Draft Environmental Impact Statement (PDF, 25 MB)
Executive Summary of Draft EIS (PDF, 906 KB)
Document Errata (PDF, 79 KB)
Supplemental Environmental Impact Statement (SEIS)
FHWA Federal Register Notice to Rescind the Notice of Intent
Technical Reports:
Air Quality Tech Report (11 MB)
Alternatives Tech Report (34 MB)
Archaeological Assessment (41 MB)
Architectural Evaluation (13 MB)
Farmland Tech Memo (590 KB)
Hazardous Materials Tech Memo (10 MB)
Indirect and Cumulative Tech Memo (100 KB)
Land Use Tech Memo (2 MB)
Natural Resources Tech Report (12 MB)
Traffic & Transportation Tech Report (6.9 MB)
Visual Resources Tech Memo (925 KB)
Socioeconomics Tech Report (9 MB)
Right of Way & Relocation Tech Memo (1.5 MB)
Phase I Architectural Survey Mgmt Summary (2 MB)
Parks & Recreation Tech Memo (4 MB)
Noise Analysis Tech Report (43 MB)
Technical Reports
Technical Reports:
Archaeological Assessment (41 MB)
Architectural Evaluation (13 MB)
Farmland Tech Memo (590 KB)
Hazardous Materials Tech Memo (10 MB)
Indirect and Cumulative Tech Memo (100 KB)
Land Use Tech Memo (2 MB)
Natural Resources Tech Report (12 MB)
Traffic & Transportation Tech Report (6.9 MB)
Visual Resources Tech Memo (925 KB)
Socioeconomics Tech Report (9 MB)
Right of Way & Relocation Tech Memo (1.5 MB)
Phase I Architectural Survey Mgmt Summary (2 MB)
Parks & Recreation Tech Memo (4 MB)
Noise Analysis Tech Report (43 MB)
- Air Quality Tech Report (11 MB)
- Alternatives Tech Report (34 MB)
- Left Item 3
- Left Item 4
- Left Item 5
- Right Item 1
- Right Item 2
- Right Item 3
- Right Item 4
- Right Item 5
January 2013 Public Hearing
- Table of Environmental Impacts (320 KB)
- Retained Alternatives
- No Build Alternative (520 KB)
- Build 8 Alternative (470 KB)
- Build 8 Managed Alternative (172 KB)
- Build 10 Alternative (449 KB)
- Public Hearing Brochure (4 MB)
- Public Hearing Boards:
- Welcome (2.4 MB)
- No Build Alternative (858 KB)
- Build 8 Alternative (929 KB)
- Build 8 Managed Alternative (1 MB)
- Build 10 Alternative (1 MB)
- Summary (1.7 MB)
- Environmental Resources (1.6 MB)
- Project Schedule (886 KB)
- Other Projects (1.5 MB)
- Thank You (1 MB)
- Aerial Boards
April 2012 Citizen Information Meeting
- Meeting Handout
- Meeting Boards:
- Corridor Displays
- Frequently Asked Questions
July 2011 Citizen Information Meeting (PDFs)
- Welcome display (1.2MB)
- EIS process (1 MB)
- Environmental considerations (1.8 MB)
- Other projects (3 MB)
- Project schedule (700 KB)
- Thank you (2.3 MB)
- Transportation challenge (1.5 MB)
- Existing conditions - 1 (1 MB)
- Existing conditions - 2 (474 KB)
- Existing conditions - 3 (973 KB)
- HRBT citizen information meeting - brochure (1.8 MB)
- Powerpoint Presentation in Windows Video (Chrome User? Click here)
News
- VDOT TO HOST CITIZEN INFORMATION MEETINGS FOR HAMPTON ROADS BRIDGE TUNNEL ENVIRONMENTAL IMPACT STATEMENT (July 11, 2011)