Recently Completed: South Quay Bridge Replacement (Route 189)
Cost and schedule ►
Traffic alerts ►
Public outreach ►
The project is located on South Quay Road (Route 189) in Southampton County and the City of Suffolk. The previous bridge was constructed in 1940; was listed as structurally deficient with a load posting of 22 tons and had a vertical clearance of 15-feet.
The project involved construction of new roadway and bridge with two 11-foot lanes and 6-foot shoulders. Due to the higher elevation of the new bridge, improvement of 1,006 feet of approach roadway was also required.
Benefits
The purpose of the project was to replace the existing structurally deficient and functionally obsolete swing span bridge with a fixed span structure that will have a 35-foot vertical clearance.
Major Milestones
Most recent milestones listed first:
- Route 189 reopened to traffic on the new bridge on May 4, 2023, with final construction activities completed ahead of schedule in May 2023, over 30 days early.
- Bryant Structures Inc. based in Toano, Virginia was awarded the construction contract. Construction began in March 2021, with scheduled completion in Summer 2023.
- The South Quay Road Bridge Replacement project was scheduled for advertisement in August 2020.
- A design public hearing was held Wednesday, January 18, 2017 at Southampton County Office Center.