In Design: Route 50 over Goose Creek Bridge Replacement in Fauquier County

Cost and schedule ►

Public outreach ►

This project will replace the Route 50 bridge over Goose Creek. The bridge located between the Village of Upperville and the Town of Middleburg was built in 1954. 

The project includes corrosion-resistant steel to reduce long-term maintenance, as well as aesthetic treatment of the bridge parapets and rails that will pay homage to the surrounding historic area. Two lanes will remain along the new bridge with wider shoulders in each direction.  

The bridge averages 7,600 vehicles a day based on 2019 data.

Estimated Costs
Preliminary Engineering - $1 million
Right of Way Acquisition and Construction - $15.6 million
Total - $16.6 million

The project's preliminary engineering phase is financed with state funding; the right of way and construction phases are planned to be financed with federal and state funding.

Benefits 

This project aims to improve long-term safety and operations.

Major Milestones 

Begin Preliminary Engineering - January 2021
Virtual Public Information Meeting - May 2023
Design Public Hearing - Fall 2024
Begin Construction - To be determined

Resources

Contact Info:

Sharif Ramsis, PhD, P.E.
Structure & Bridge
703-259-2607

Kimberly McCool, P.E.
Preliminary Engineering
703-259-3220

Project Photos

Other relevant links:

Virtual Public Information Meeting VideoPresentation, Comment SheetNews ReleaseAd and Meeting Details - May 2023

Phase: In Design

UPC: 118398

State ID: 0050-96A-623, B603, P101, R201

Federal ID: STP-BR09 (309)

Lat/Long: 38.980215, -77.820955

Locality: Fauquier