Map of construction project districts

In Design

Route 220 Corridor Intersection Improvements

Project at a Glance
Begin Date
Spring 2024

Cost
$21.7 million

Locality
Franklin, Henry, and Roanoke

District
Salem

Contact
Brett Elledge, P.E.
(540)-387-5353

PROJECT DESCRIPTION

The purpose of this $16.1-million project is to improve signalized intersections along Route 220 in the City of Roanoke and the counties of Roanoke, Franklin and Henry.  Seven signalized intersections along this important corridor will be modified using an innovative intersection design known as a thru-cut.

A thru-cut intersection redirects side-street through traffic to turn left or right at the signal and to turn directly into businesses or to use a nearby crossover to make a U-turn.

Modifying these intersections will increase efficiency and create shorter wait times along the Route 220 corridor by reducing signal phases.  With fewer signal phases, more time can be provided to the Route 220 through movements without reducing service to the side-street movements.  

The resulting improvement in operations is similar to widening Route 220 from four lanes to six lanes, but at a fraction of the cost.  

Reducing stop and go traffic also enhances safety. Crashes may be reduced by approximately 15-20 percent.  

This project also includes installing pedestrian accommodations as needed at the urban intersections. 

Construction is expected to begin in late 2023. 

Virtual Design Public Hearing

A design public hearing was held as a virtual/online event on April 21, 2021. VDOT representatives made a presentation and answered questions from the chat forum. 

To access the recording and review meeting materials, click on the link below: 

BENEFITS

  • Improves safety: Reduces rear-end collisions
  • Increases efficiency: Reduces delays by 20% and lessens the number of stops at intersections
  • Creates shorter wait times: Reduces the number of signal phases
  • Provides Cost-effective Benefits: Improves corridor at a cost that is less than 10% of traditional widening
  • Enhances Pedestrian Safety: Adds new crosswalks and other features 

View the pictures below of each specific intersection.

ROANOKE/ROANOKE COUNTY
 
Route 220 & Clearbrook Village Lane/Indian Grave Road Intersection 

Route 220 & Buck Mountain Road/Stable Road Intersection

ROANOKE COUNTY

Route 220 & Pheasant Ridge Road/Crossbow Circle Intersection

Route 220 & Southern Hills Drive/Valley Avenue Intersection

FRANKLIN COUNTY

Route 220 & Sontag Road/Cassell Drive Intersection

Route 220 & Wirtz Road Intersection

HENRY COUNTY

Route 220 & Dyer Street

PUBLIC INVOLVEMENT

VDOT received public comments on the project in September/October 2020. Based on public input, VDOT has revised intersection designs at Dyer Street in Henry County, Sontag Road/Cassell Drive in Franklin County and Stable Road/Buck Mountain Road in Roanoke County.