In Design: Fairfax County Parkway Widening South
Cost and schedule ►
Public outreach ►
This project will widen about two miles of Fairfax County Parkway (Route 286) from four lanes to six between Route 123 (Ox Road) and Nomes Court.
The project also includes:
- Installing concrete median barriers along tight curves and raised grass medians elsewhere
- Constructing the missing shared-use path segment along Fairfax County Parkway between Route 123 and Burke Centre Parkway
- Making Fairfax County Parkway/Burke Centre Parkway intersection improvements including a new westbound Burke Centre Parkway free-flow right-turn lane
- Adding a grade-separated bicyclist and pedestrian crossing just north of Burke Centre Parkway
- Improving the Route 123 interchange by widening the southbound Fairfax County Parkway ramp to Route 123 from one lane to two and adding a third left-turn lane on the ramp
- Enhancing the sound wall along southbound Fairfax County Parkway between Clara Barton Drive and Route 123
Fairfax County Parkway averages about 61,000 vehicles a day within the project limits.
Estimated Project Costs
Preliminary Engineering - $350,000
Right of Way Acquisition and Utility Relocation - $4.9 million
Construction - $118.2 million
Total - $123.4 million
This project is financed with federal, state, Northern Virginia Transportation Authority and local funding
Benefits
This project will reduce congestion and improve safety and bicyclist/pedestrian accessibility and mobility.
Major Milestones
First Public Information Meeting - December 2017
Second Public Information Meeting (Series) - September/October 2018
Third Public Information Meeting - January 2019
Fourth Public Information Meeting - November 2019
Design Public Hearing - December 2019
Begin Design-Build Procurement - July 2023
Award Design-Build Contract - Spring 2024
Resources
Sitaram Kodali, P.E.
Location & Design
703-691-6710
Minwoo Ha, P.E.
Preliminary Engineering
703-259-2207
Other relevant links:
Design Public Hearing - December 2019 (Ad)
Meeting Materials and Displays:
- Aerial Overview: Route 123 Interchange, Route 123 to Clara Barton Drive, Burke Centre Parkway to Fairfax Station Road and Popes Head Creek to Nomes Court
- Burke Centre Parkway Intersection Time of Day Left-Turn Restriction
- Potential Environmental Resource Impacts
Environmental Assessment - November 2019
Natural Resources Report - November 2019
Air Quality Report - October 2019
Burke Centre Parkway Intersection "Option C" - April 2019
Supplemental Archaeological Survey - Feb. 2019
Preliminary Noise Analysis - October 2018
Report, Figures, Appendices A-B and Appendices C-K
Cultural Resources Survey - August 2018
Hazardous Materials Report - April 2018
Fairfax County Department of Transportation Concept Plans - June 2013
Fairfax County Parkway and Popes Head Road Interchange Webpage
Phase: In Design
UPC: 122982
State ID: 0286-029-489,B624, B625, B627, B629, C501, D621, P101, R201
Federal ID: RSTP-5B01 (540)
Lat/Long: 38.796510, -77.336828
Locality:
Fairfax