In Design: Fairfax County Parkway Widening North
Cost and schedule ►
Public outreach ►
Please note: This is the webpage for the Fairfax County Parkway Widening North project (Nomes Court to Route 29).
- Fairfax County Parkway and Popes Head Road Interchange Project Webpage
- Fairfax County Parkway Widening South (Route 123 to Nomes Court) Project Webpage
This project will widen about three miles of Fairfax County Parkway from four lanes to six between Nomes Court and Route 29 (Lee Highway).
The project will also construct noise walls in the area of the Route 29 interchange.
Fairfax County Parkway averages about 78,000 vehicles a day within the project limits.
Estimated Costs
Preliminary Engineering - $17.9 million
Right of Way Acquisition and Utility Relocation - $2.2 million
Construction - $90.8 million
Total: $110.9 million
The project is financed with federal, state (including Revenue Sharing), Northern Virginia Transportation Authority and local funding.
Benefits
This project aims to reduce congestion and improve safety and traffic flow while maintaining bicyclist and pedestrian accessibility and mobility.
Major Milestones
First Public Information Meeting - December 2017
Second Public Information Meeting (Series) - September/October 2018
Third Public Information Meeting - January 2019
Fourth Public Information Meeting - November 2019
Design Public Hearing - December 2019
Begin Right of Way Acquisition - December 2022
Advertise for Construction - Early 2024
Begin Construction - Mid-2024
Resources
Sitaram Kodali, P.E.
Location & Design
703-691-6710
Minwoo Ha, P.E.
Preliminary Engineering
703-965-0318
Other relevant links:
Noise Barrier Survey Results - August 2021
Design Public Hearing - December 2019 (Ad)
Meeting Materials and Displays:
- Aerial Overview: Popes Head Creek to Nomes Court, Ladues End Lane to Colchester Meadow Lane, Popes Head Road and Future Shirley Gate Road Extension, Piney Branch, Braddock Road Interchange, Between Braddock Road and Route 29, Route 29 Interchange and Route 29 to I-66
- Potential Environmental Resource Impacts
Environmental Assessment - November 2019
Natural Resources Report - November 2019
Air Quality Report - October 2019
Supplemental Archaeological Survey - Feb. 2019
Preliminary Noise Analysis - October 2018
Report, Figures, Appendices A-B and Appendices C-K
Cultural Resources Survey - August 2018
Hazardous Materials Report - April 2018
Fairfax County Department of Transportation Concept Plans - June 2013
Fairfax County Parkway and Popes Head Road Interchange Project Webpage
Fairfax County Parkway Widening South Project Webpage
Phase: In Design
UPC: 107937
State ID: 0286-029-259, B628, B630, B631, B632, C501, D605, P101, R201
Federal ID: STP-5A01 (775), STP-5B01 (309)
Lat/Long: 38.820174, -77.349058
Locality:
Fairfax