Coming Soon: Fairfax County Parkway and Popes Head Road Interchange
Cost and schedule ►
Public outreach ►
Please note: The construction contract has been awarded. Construction activities are expected to begin in December and a "Pardon Our Dust" information meeting for residents and travelers is being planned for late January/early February.
This project will replace the traffic signal at Fairfax County Parkway (Route 286) and Popes Head Road (Route 654) with an interchange. The interchange will feature triple roundabouts that will allow traffic to flow freely via two new bridges over Fairfax County Parkway.
The project also includes:
- Building a short segment of the future Shirley Gate Road extension that will provide pedestrian and vehicle access to the future Patriot Park (Fairfax County is designing the rest of the Shirley Gate Road extension)
- Constructing a shared-use path linking the Fairfax County Parkway Trail to the future Patriot Park
- Reconstructing the Fairfax County Parkway Trail
- Installing a sidewalk along the north side of Popes Head Road
- Extending Ladues End Lane to the new roundabout at Popes Head Road
- Adding an acceleration lane for drivers turning from Nomes Court onto northbound Fairfax County Parkway
At the intersection, Fairfax County Parkway averages about 64,000 vehicles a day and Popes Head Road averages about 3,200.
Estimated Project Costs
Preliminary Engineering - $3.7 million
Right of Way Acquisition and Utility Relocation - $10.6 million
Construction - $78 million
Total - $92.4 million
This project is financed with federal, state (including Smart Scale), Northern Virginia Transportation Authority and local funding.
Benefits
This project aims to relieve congestion and improve safety and traffic flow while maintaining bicyclist and pedestrian accessibility and mobility.
Major Milestones
First Public Information Meeting - December 2017
Second Public Information Meeting (Series) - September/October 2018
Third Public Information Meeting - January 2019
Fourth Public Information Meeting - November 2019
Design Public Hearing - December 2019
Begin Right of Way Acquisition - September 2021
Advertise for Construction - July 2023
Award Construction Contract - October 2023
Begin Construction - December 2023
"Pardon Our Dust" Meeting - Late January/Early February 2024
Final Completion - Late 2026
Resources
Oscar Jamilla, DPE, PMP
Construction
703-259-2769
Chan Basnayake, P.E., PMP, CCM
Construction
703-259-2947
Other relevant links:
Construction Contract Award News Release - November 2023
Design Public Hearing - December 2019 (Ad)
Meeting Materials and Displays:
- Aerial Overview: Ladues End Lane to Colchester Meadow Lane, Popes Head Road and Future Shirley Gate Road Extension and Piney Branch
- Popes Head Road Interchange Rendering
- Potential Environmental Resource Impacts
Environmental Assessment - November 2019
Natural Resources Report - November 2019
Air Quality Report - October 2019
Supplemental Archaeological Survey - Feb. 2019
Preliminary Noise Analysis - October 2018
Report, Figures, Appendices A-B and Appendices C-K
Cultural Resources Survey - August 2018
Hazardous Materials Report - April 2018
Fairfax County Department of Transportation Concept Plans - June 2013
Fairfax County Parkway Widening North Project Webpage
Fairfax County Parkway Widening South Project Webpage
Phase: Coming Soon
UPC: 111725
State ID: 0286-029-365, B619, B620, C501, D616, P101, R201
Federal ID: NHPP-5B01 (449)
Lat/Long: 38.820159, -77.349067
Locality:
Fairfax