Construction Scheduling
Construction Home | Advertisement | Bid Letting | Bid Tabulations | Construction Engineering and Inspection | Construction Quality Improvement Program | Construction Management | Construction Scheduling | Document Sales | Information, Memos, & Letters | Online Forms | Local Administered Projects | Prequalification | Resources | Specifications | Value Engineering | Email Us
- Contract Time Determination (CTD) Scheduling
- CD-2007-11 (Contract Time Determination CD) (PDF)
- FHWA CTD Guidelines (PDF)
- VDOT CTD Guidelines (PDF)
- VDOT CTD Bar-chart Template (Excel)
- VDOT Production Rates (Excel spreadsheet)
- Other DOT Production Rate Averages (Excel)
- Duralator (Excel)
- Post-award Construction Scheduling
- VDOT Post-award Scheduling Guide
- VDOT Primavera P6 Schedule Scrubber - ZIP
- Guidelines for Using the VDOT Primavera P6 Scrubber Tool
- Project Category (PDF) (7/18/22)
- Cat M Special Provision for Schedule of Operations (PDF)
- Cat I Special Provision for Progress Schedule (PDF) 7/18/22
- Cat II Special Provision for Progress Schedule (PDF) 7/18/22
- Cat III Special Provision for Progress Schedule (PDF) 7/18/22
- Design-Build Special Provision for Project Schedule (Exhibit 11.1)
- VDOT CPM Schedule Template (MS Excel)
- VDOT CPM Schedule Template User Guide
- Guidelines for Conducting a Scheduling Conference (PDF)
- VDOT P6 Standard Bid Item Resources (ver.7.0.xer)
- Form C-13C Contractor’s Progress Earnings Schedule (XLSM - spreadsheet) - update 10/2/2023
- Guidelines for preparing the VDOT Form C-13C (PDF) 10/2/2023
- Form C-13CPM Contractor’s Progress Earnings Schedule (Excel)
- Guidelines for preparing the VDOT Form C-13CPM(PDF)
- Primavera (P6) Activity Cost-loading Report (ACR) (P6 ACR Report File)
- Primavera P6 Monthly Progress Earnings Schedule Data Export Report (Form C-13CPM By Calendar Month)
- Primavera P6 Monthly Progress Schedule Data Export Report (Form C-13CPM By Estimate Dates)
- Contractor's Monthly Commodity Progress Report (Form C-13CPR) - EXCEL
- Guidelines for Completing the VDOT Form C-13CPR - PDF
- Contractor's Commodity-loading Report (CLR) - Primavera P6 Report (12/2023)
- Contractor's Monthly Commodity Progress Report(Form C-13CPR_Calendar Months) - Primavera P6 Report
- Contractor's Monthly Commodity Progress Report (Form C-13CPR_Estimate Dates) - Primavera P6 Report
- As-Built Schedule Tracker Zip File
- Guidelines for Using the As-Built Schedule Tracker 7/16/2020
- As-built Schedule Tracker Primavera P6 Layout File
- VDOT-VT Partnership for Project Scheduling
- Construction Scheduling MBTP Training Overview
- A Review of State DOT Methods for Determining Contract Times
- Analysis of VDOT Contract Values and Times
- Dura-Lator: A Project Duration Calculator
- Management Principles of Scheduling
- A Review of the Operational and Contract Administration Implications of Schedule Response
- Schedule Submittal Requirements
- Schedule Impact Analysis Using CPM Schedules
- Management Principles of Schedule Impact Analysis
- Development of an Intellectual Framework for Schedule Control
- Required Performance Method of Schedule Control
- Implementing Change in a Public Agency: Applying a Process to Produce Change in VDOT
- Contract Time Determination Guidelines
- Tracking Project Commodities for Progress Control
- Other Construction Scheduling Reference Materials and Websites
Page last modified: Dec. 7, 2023