Construction Home | Advertisement | Bid Letting | Bid Tabulations | Construction Engineering and Inspection | Construction Quality Improvement Program | Construction Management | Construction Scheduling | Document Sales | Information, Memos, & Letters | Online Forms | Local Administered Projects | Prequalification | Resources | Specifications | Value Engineering | Email Us
- Contract Time Determination (CTD) Scheduling
- CD-2007-11 (Contract Time Determination CD) (PDF)
 - FHWA CTD Guidelines (PDF)
 - VDOT CTD Guidelines (PDF)
 - VDOT CTD Bar-chart Template (Excel)
 - VDOT Production Rates (Excel spreadsheet)
 - Other DOT Production Rate Averages (Excel)
 - Duralator (Excel)
 
 - Post-award Construction Scheduling
 - VDOT Post-award Scheduling Guide
 - VDOT Primavera P6 Schedule Scrubber - ZIP
 - Guidelines for Using the VDOT Primavera P6 Scrubber Tool
 - Project Category (PDF) (7/18/22)
 - Cat M Special Provision for Schedule of Operations (PDF)
 - Cat I Special Provision for Progress Schedule (PDF) 7/18/22
 - Cat II Special Provision for Progress Schedule (PDF) 7/18/22
 - Cat III Special Provision for Progress Schedule (PDF) 7/18/22
 - Design-Build Special Provision for Project Schedule (Exhibit 11.1)
 - VDOT CPM Schedule Template (MS Excel)
 - VDOT CPM Schedule Template User Guide
 - Guidelines for Conducting a Scheduling Conference (PDF)
 - VDOT P6 Standard Bid Item Resources (ver.7.0.xer)
 - Form C-13C Contractor’s Progress Earnings Schedule (XLSM - spreadsheet) - update 10/2/2023
 - Guidelines for preparing the VDOT Form C-13C (PDF) 10/2/2023
 - Form C-13CPM Contractor’s Progress Earnings Schedule (Excel)
 - Guidelines for preparing the VDOT Form C-13CPM(PDF)
 - Primavera (P6) Activity Cost-loading Report (ACR) (P6 ACR Report File)
 - Primavera P6 Monthly Progress Earnings Schedule Data Export Report (Form C-13CPM By Calendar Month)
 - Primavera P6 Monthly Progress Schedule Data Export Report (Form C-13CPM By Estimate Dates)
 - Contractor's Monthly Commodity Progress Report (Form C-13CPR) - EXCEL
 - Guidelines for Completing the VDOT Form C-13CPR - PDF
 - Contractor's Commodity-loading Report (CLR) - Primavera P6 Report (12/2023)
 - Contractor's Monthly Commodity Progress Report(Form C-13CPR_Calendar Months) - Primavera P6 Report
 - Contractor's Monthly Commodity Progress Report (Form C-13CPR_Estimate Dates) - Primavera P6 Report
 - As-Built Schedule Tracker Zip File
 - Guidelines for Using the As-Built Schedule Tracker 7/16/2020
 - As-built Schedule Tracker Primavera P6 Layout File
 - VDOT-VT Partnership for Project Scheduling
- Construction Scheduling MBTP Training Overview
 - A Review of State DOT Methods for Determining Contract Times
 - Analysis of VDOT Contract Values and Times
 - Dura-Lator: A Project Duration Calculator
 - Management Principles of Scheduling
 - A Review of the Operational and Contract Administration Implications of Schedule Response
 - Schedule Submittal Requirements
 - Schedule Impact Analysis Using CPM Schedules
 - Management Principles of Schedule Impact Analysis
 - Development of an Intellectual Framework for Schedule Control
 - Required Performance Method of Schedule Control
 - Implementing Change in a Public Agency: Applying a Process to Produce Change in VDOT
 - Contract Time Determination Guidelines
 - Tracking Project Commodities for Progress Control
 
 - Other Construction Scheduling Reference Materials and Websites
 